header banner
SOCIETY

Govt aims to restore flood-damaged roads by mid-October

The government has intensified efforts to bring flood damaged road networks back into operation within the next month, with a target of resuming all land based connectivity—including roads and bridges—by mid October.
alt=
By REPUBLICA

KATHMANDU, Sept 14: The government has intensified efforts to bring flood damaged road networks back into operation within the next month, with a target of resuming all land based connectivity—including roads and bridges—by mid October.



Priority has been placed on opening alternative routes and installing cable crossings and suspension bridges to restore immediate transport links, followed by the construction of permanent paved roads and bridges.


At Monday’s meeting at the Office of the Prime Minister and Council of Ministers—attended by Prime Minister Balendra Shah and lawmakers from flood affected constituencies—Infrastructure Development Minister Sunil Lamsal said restoration work is advancing through eight thematic task forces focused on roads and bridges.


Related story

DoR constructs over 36,000 kilometers of roads across Nepal so...


According to Lamsal, the immediate focus is on re-establishing transport in the affected districts. Alternative roads, cable crossings, and suspension bridges are being installed wherever feasible, while permanent structures will be built once temporary connectivity is ensured.


The Rapid Damage and Needs Assessment (RDNA) report shows the Bhotekoshi-Trishuli floods damaged 69 kilometers of roads, washed away 33 motorable bridges, and partially damaged four others. Reconstruction of devastated structures is estimated to cost Rs 723.31 billion, with Rs 473.57 billion earmarked for infrastructure including energy and road networks.


The government has called for direct coordination with local representatives to avoid duplication of efforts and stressed the need for plans based on accurate ground level data on damage and immediate requirements.


In addition, drinking water systems in flood hit areas are targeted for restoration by mid-December. Minister Lamsal said repair and reconstruction of water infrastructure is already underway. “Alongside roads and bridges, the government has prioritized the restoration of basic infrastructure, including drinking water, health, and education facilities under the integrated program of reconstruction and rehabilitation,” he noted.


 

Related Stories
SOCIETY

Road department to hand over valley roads to local...

ePZxpXOON2f7mhpsgAxzPtIbuSIMIr46hZln4nQu.jpg
The Week

Country roads

country-roads.jpg
Editorial

Restore the Roads, Bridges

monsoon-damages-baglung-roads.jpg
SOCIETY

Residents of Karnali exposed to high risks of acci...

accident_20221203101915.jpg
SOCIETY

A thousand small roads are being constructed in Ka...

myrepublica-default-logo.jpg